The Salesforce exit checklist (30 items)

A complete Salesforce exit checklist covers 30 sequential tasks across six phases: contract notice review, org and automation inventory, full API and Weekly Data exports (including 24-month field history before rolling deletion), data cleanup, two staging trial loads with dashboard verification, and cutover weekend. Starting four to five months before your contract renewal keeps you clear of auto-renewal windows.

Key facts

  • Standard Salesforce Field History Tracking retains history for 18 months in the user interface and up to 24 months via the API or Data Loader before automatic deletion unless Shield Field Audit Trail is purchased. Source: help.salesforce.com
  • Salesforce Weekly Data Export archives are available weekly on Enterprise and Unlimited (every 29 days on Professional and lower), expire 48 hours after completion, and enforce a 60-second wait between zip downloads. Source: help.salesforce.com
  • Odoo's import framework relies on preserving source record IDs as external IDs so repeated trial loads and final delta syncs update records without creating duplicates. Source: odoo.com
  • iVentureTeam recommends keeping the full Salesforce export and staging database for at least one year after cutover for historical audit questions. Source: iventureteam.com
Project lead checking off printed migration milestone sheets beside a laptop on a wooden desk
On this page

How to use this 30-item Salesforce exit checklist

Work through these 30 items in sequence starting four to five months before your Salesforce renewal date so you never lose historical records, miss a cancellation deadline, or cut over without verified counts. This checklist expands the planning phase of our complete guide to leaving Salesforce for Odoo into concrete operational tasks.

If you want a scored readiness report and emailed checklist summary tailored to your seat count and Flows, run the Salesforce exit readiness scorecard.

Phase 1: Contract notice and exit timing (items 1–5)

Confirm your contractual deadlines before touching data so you avoid accidental auto-renewal.

  1. Locate your Master Subscription Agreement and current Order Form: Record the exact contract end date, active seat counts by edition, and any add-ons (CPQ, Account Engagement, Premier Support, extra storage).
  2. Verify your written cancellation notice window: Check whether your agreement requires 30, 45, or 60 days of advance notice before renewal, and set a calendar deadline two weeks earlier.
  3. Check partial-seat reduction clauses: Confirm whether Salesforce permits reducing to one archive user at renewal or enforces minimum seat commitments.
  4. Assign internal project owners: Name one executive sponsor, one sales operations lead, and one data owner responsible for sign-off on record counts.
  5. Audit active vs paid licences: Pull a 90-day login report from Salesforce Setup to identify unused seats and former employees whose records must stay attributed to archived users.

Phase 2: Org inventory and automation backlog (items 6–11)

Separate what moves as data from what must be rebuilt—detailed in Salesforce to Odoo migration: what moves, what is rebuilt—before writing any script.

  1. Record baseline object counts: Capture exact row counts for Accounts, Contacts, Leads, Opportunities (open and closed), Tasks, Events, Emails, Attachments, Products, and Price Books.
  2. Export Salesforce metadata for Flows and Process Builder: List every active Flow, note what triggers it, and mark each as Rebuild in Odoo, Retire, or Handled natively by Odoo Sales/CRM.
  3. Audit Apex triggers, classes, and validation rules: Flag any custom Apex code doing external API syncs, territory assignment, or commission math; if Apex drives core operations, verify fit with when you should not leave Salesforce.
  4. Inventory connected AppExchange packages and APIs: List telephony dialers, e-signature tools, web-to-lead forms, and ERP syncs wired to Salesforce.
  5. Rank the weekly reports leadership actually opens: Trim saved Salesforce reports down to the 5 to 20 pipeline, win/loss, and rep scorecards your managers open every week.
  6. Inspect active sandboxes: Check whether any in-flight rules or layouts exist in a sandbox that have not been deployed to production or documented.

Phase 3: Full data, attachment, and 24-month field history exports (items 12–18)

Pull raw snapshots and API extracts early so Salesforce rolling retention limits never delete audit data before you leave.

  1. Run a full Weekly Data Export with attachments and Files checked: Per Salesforce Weekly Data Export documentation (checked Nov 2026), Enterprise and Unlimited orgs run weekly while Professional and lower run every 29 days.
  2. Download all export zip archives within 48 hours: Salesforce deletes generated export zips after 48 hours and triggers HTTP ERROR 429 if you download files simultaneously—respect the required 60-second wait between zip downloads.
  3. Export Field History Tracking via API before 24 months roll off: Per Salesforce Field Audit Trail documentation (checked Nov 2026), standard Field History Tracking stays visible for 18 months in the UI and is queryable for up to 24 months via the API or Data Loader (queryAll()) before rolling deletion unless Shield Field Audit Trail is licensed. Export OpportunityFieldHistory and AccountHistory immediately.
  4. Run Data Loader “Export All” for archived activities and recycle-bin records: Weekly Export and standard queries skip soft-deleted or archived tasks older than one year unless Export All is used.
  5. Verify binary integrity on ContentVersion and Attachment pulls: Confirm PDFs, quotes, and images linked to opportunities open cleanly outside Salesforce.
  6. Snapshot formula and roll-up summary values: Export calculated columns from reports or objects, because Weekly Data Export excludes underlying formula definitions.
  7. Store raw backup archives in two independent offsite locations: Keep one encrypted cold archive outside both Salesforce and the new CRM for at least 12 months post-cutover (iVentureTeam, Oct 2026).

Phase 4: Data cleanup and mapping table (items 19–23)

Fix duplicates and broken picklists on staged copies before loading Odoo so clean dashboards work on day one.

  1. Lock the timestamped pre-cleanup CSV backup: Never alter exported data without keeping an unmodified raw copy.
  2. Build a picklist consolidation mapping table: Map legacy Salesforce Lead Sources, Stages, and Loss Reasons to clean Odoo selections while retaining the original Salesforce string in a preserved reference field.
  3. Deduplicate parent Accounts and orphan Contacts: Merge duplicate companies by domain and Salesforce ID before wiring child contacts via parent_id.
  4. Close stale open opportunities: Review deals untouched for 12 to 24 months and mark them Lost with a clear historical reason so active pipeline forecasts stay accurate.
  5. Create archived user records for departed reps: Preserve historical attribution on closed deals instead of assigning old opportunities to the admin account.

Phase 5: Staging trial loads and dashboard setup (items 24–27)

Test your migration twice on real data before touching production cutover.

  1. Execute Trial Load 1 keyed on Salesforce external IDs: Following Odoo’s import best practices (checked Nov 2026), store every Salesforce 18-character ID as the Odoo external ID so re-runs update rather than duplicate records.
  2. Run Trial Load 2 with backdated timestamps, emails, and attachments: Verify that opportunity creation dates, close dates, chatter threads, and file attachments render accurately.
  3. Spot-check 50 records with sales managers: Compare 50 open and closed opportunities side by side between Salesforce and staging Odoo, checking amounts, stages, owners, and activity logs.
  4. Configure Quick Lists, Sales Dashboard tabs, and team training: Set default 12-month Quick Lists, test the Odoo Sales Dashboard tabs, and give reps a day-one cheat sheet.

Phase 6: Cutover weekend and post-launch sign-off (items 28–30)

Execute the production switch cleanly while Salesforce remains live as a safety net.

  1. Run the Friday freeze and cutover delta sync: Pause new record creation in Salesforce on Friday evening, pull every opportunity, email, and attachment created or modified since Trial Load 2, and load the delta into production Odoo—following a documented cutover weekend run sheet.
  2. Verify production counts and repoint web forms and email aliases: Confirm row counts match Salesforce within agreed tolerances before switching web-to-lead forms and inbound sales aliases to Odoo.
  3. Send written Salesforce non-renewal notice and retain read-only access during month one: Keep Salesforce live in read-only mode for 14 to 45 days of hypercare, confirm your final archive, and submit written cancellation before your contract notice deadline.

Month-by-month exit timeline and role ownership

Working backwards from your Salesforce renewal date keeps your data engineering clear of your cancellation notice cutoff. Most 15-to-100-seat exits follow a 16-to-20-week calendar across four internal and vendor roles:

Target window Checklist items Primary owner Gate before moving forward
T-20 to T-16 weeks Items 1–5 (contract notice and seat audit) Executive sponsor / Finance Renewal deadline and 30–60 day notice date confirmed
T-16 to T-13 weeks Items 6–11 (org inventory and report ranking) Sales ops lead Active Flows, Apex, and weekly report list signed off
T-13 to T-10 weeks Items 12–18 (full exports and 24-month history) Data owner / Engineer Verified zip archives, binary attachments, and API history stored
T-10 to T-6 weeks Items 19–23 (cleanup and picklist map) Data owner / Engineer Pre-cleanup CSV locked; duplicate and stale-deal rules approved
T-6 to T-2 weeks Items 24–27 (two trial loads and training) Sales ops + Sales managers 50-record spot-check passed; dashboards and Quick Lists live
Cutover + T+30 days Items 28–30 (delta sync and notice letter) Full team Production counts verified; written non-renewal notice sent

How to export Field History and Setup Audit Trail without gaps

Standard Weekly Data Export CSVs do not protect long-term audit history or configuration logs on their own, so two targeted exports belong in Phase 3 before your org shuts down.

  • Setup Audit Trail (180-day rolling limit): Salesforce displays only the 20 most recent setup changes in the UI and allows a CSV download covering the last 180 days (Salesforce Ben, checked Nov 2026; Gearset, checked Nov 2026). Download SetupAuditTrail from Setup early—and again on cutover weekend—so you keep a complete record of every rule, profile, and connected-app change made before exit.
  • Field History Tracking via Data Loader (Export All): Per Salesforce Help (checked Nov 2026), extracting older field history up to the 24-month limit requires opening Data Loader Settings, unchecking “Use Bulk API” so queries run through SOAP queryAll(), selecting Export All instead of standard Export, and checking Show all Salesforce objects to pull OpportunityFieldHistory, AccountHistory, and custom __History tables.

For a deeper walkthrough of Bulk API limits, ContentVersion attachment trees, and email thread extraction, read our Salesforce data export guide and Salesforce renewal exit timing guide.

Four checklist mistakes that delay cutover

Even organized teams stall in Phase 3 or Phase 5 when they overlook four operational details:

  1. Letting Weekly Data Export zips expire after 48 hours: Automated exports finish asynchronously and delete themselves two days later; schedule one owner to download every zip sequentially with the required 60-second gap.
  2. Reassigning closed history from departed reps to an admin: Mapping past deals onto an active admin skews rep scorecards and win/loss attribution in Odoo.
  3. Testing only open pipeline during Trial Load 1: Verify 2021–2025 closed deals, chatter emails, and PDF attachments alongside open pipeline so reporting parity holds on day one.
  4. Skipping OAuth readiness in week one: Connecting Salesforce through OAuth requires an admin with API and connected-app permissions; if an outside agency manages your Salesforce admin login, loop them in during Phase 1 rather than cutover month.

Need a team to run this checklist for you and hand back a binding fixed price in five business days? Book a $1,500 Salesforce exit audit (credited in full toward a migration signed within 60 days), review our Salesforce to Odoo migration service page, or estimate your project savings in the Salesforce-to-Odoo cost and savings calculator.

Frequently asked questions

How long does Salesforce keep Field History Tracking before deleting it?

Per Salesforce documentation, standard Field History Tracking stays visible in the record history UI for 18 months and remains accessible via the API or Data Loader (queryAll) for up to 24 months. Any history older than 24 months is deleted on a rolling basis unless you license Salesforce Shield Field Audit Trail.

Why isn't the Salesforce Weekly Data Export enough on its own for a migration?

Weekly Data Export produces CSV snapshots and raw file references, but it excludes formula logic, strips live email-thread links to Odoo chatter, expires after 48 hours, and enforces a 60-second pause between zip file downloads. You should pull Weekly Data Export as your cold backup while using API/Data Loader scripts for clean migration.

When should we start working through this 30-item Salesforce exit checklist?

Begin items 1 through 11 roughly four to five months before your Salesforce renewal date. Most annual Salesforce order forms require written non-renewal notice 30 to 60 days ahead of the contract end date, so starting early leaves room for two staging trial loads before that notice deadline.

What happens to our Salesforce sandboxes and connected apps after cancellation?

Once your Salesforce subscription terminates, production, sandboxes, and API tokens go offline permanently after Salesforce's grace/deletion cycle. Before cancellation takes effect, revoke third-party OAuth integrations, download any sandbox metadata or Apex code you want archived, and confirm your local backup CSVs and attachments open cleanly.

Can we get an interactive summary or tailored version of this 30-item checklist?

Yes. You can pair this on-page checklist with our interactive Salesforce Exit Readiness Scorecard to receive an emailed checklist and matching package summary for your org, or request a $1,500 Salesforce Exit Audit where our team inventories your org, records baseline counts, and builds your migration scope.

Sources

  1. Salesforce Field Audit Trail and Field History Retention (checked )
  2. Salesforce Weekly Data Export Service Limits (checked )
  3. Odoo 19.0 Export and Import Data Documentation (checked )
  4. iVentureTeam: Salesforce to Odoo Migration — What Moves, What to Rebuild, and Cost (checked )
  5. Salesforce Ben: Setup Audit Trail — Keep Track of Metadata Changes in Salesforce (checked )
  6. Gearset: Salesforce Audit Trail and Field History Limits (checked )
  7. Salesforce Help: Export Field History Retention via Data Loader (checked )